
Kiwin air shower is a kind of equipment specially used for clean room decoration, it can force air through, so that dust and particles are blown away, so as to achieve the purpose of purification. Air shower installation is an important link that must be passed before the use of air shower, so the installation quality directly affects the using effect.
We will send you the manual of the air shower together with the machine , it has the guidence how to assemble the air shower modular together ,and besides we have installation video teach you how to assemble step by step even you have no installing experience , it will be easy for you to assemble the machine .
For the standard straight thru air shower , it will take you 1-2 days to install one air shower machine . and 3-4 days to install the cargo air shower . and we also have professonial installation team ready to install if you need .
Preparation job before install air shower
First, the preparation before the installation of the air shower room
1. Determine the installation location: select the appropriate location according to the use requirements and the size of the air shower room. If the air shower needs to be connected to other equipment, factors such as pipes and circuits need to be taken into account.
2. Measurement size: After determining the installation position, measure the size of the air shower room, including length, width and height, to ensure that the installation can make full use of space.
3. Choose the right material: according to the measured size, choose the appropriate material, such as screws, nuts, washers, sealant, etc., to ensure the installation quality and stability.
Assembling steps
1. Install the main frame: Install the main frame in the installation position and ensure that it is secure. The main frame is mainly made of stainless steel and can withstand high winds.
2. Installation panel: The installation panel is an important part of the air shower, which can control the direction and speed of the air flow. The panels are usually made of stainless steel and can withstand high levels of wind.
3. Connect the circuit and pipeline: according to the requirements of use, connect the circuit and pipeline to ensure that the air shower room can operate normally.
4. Install power supply and control system: Install power supply and control system, including remote control, controller, etc., to ensure that users can easily control the working state of the air shower.
5. Make sealant: After the installation is completed, make sealant to ensure the tightness of the air shower room and prevent air and moisture from entering.
How to maintain the air shower ?
1. Regular cleaning: Cleaning the air shower can maintain its appearance and performance to ensure its normal operation.
2. Regular inspection: Regularly check the working status and performance of the air shower room to ensure its normal operation and timely detection of problems.
3. Avoid collision: Avoid collision in the air shower to prevent damage
Air shower installation is a complex process that requires full preparation and careful installation in order to ensure its normal work and play its maximum function. The above is about the installation of air shower room related articles, I hope to help you